Most people wait too long to change supplier. Quality has been slipping for a while, the price has gone up twice, the answers take longer and longer. But the thought of starting again with a new factory feels heavier than the problems with the old one.
It does not have to be. A change goes smoothly when the documentation is in place: drawings, specifications and approved samples. Ours have gone smoothly for exactly that reason, and we have never seen a change make things worse. What decides it is the preparation.
Before you say anything to your current supplier
A change starts with gathering what you need, while the relationship still works.
- Drawings and specifications. Everything that describes the product: dimensions, materials, finishes, colours, tolerances and packaging.
- Approved samples. The unit you approved is the reference. Without it there is nothing to compare the new factory’s production against.
- Agreements and orders. What has been ordered, what has been paid and what has been delivered.
- Ownership of the tooling. Which tools exist, where are they, and who owns them? That decides the whole plan. More in the guide who owns the tooling and the drawings?
- Stock and sales rate. How long will what you have last?
If any of this is missing, fix that first. A change without documentation becomes a new development project.
Choose the new supplier properly
It is tempting to pick the first one that says yes. Do not. The new factory should be checked as carefully as if it were the first time: track record, finances, quality and who you are actually dealing with. The guide on factory or trading company describes how to tell the difference.
Have the new factory make samples against your approved sample and your drawings. Approve nothing until it matches.
Tell the new factory openly why you are changing. A factory that knows the last supplier fell short on surface finish or lead time also knows where to take extra care. Better that the new factory says no today than says yes and makes the same mistake.
The tooling
If you own the tooling it can usually be moved to the new factory. That takes removal, transport and trial shots at the new factory, and sometimes an adjustment to fit their machines.
If the current factory owns the tooling, new tooling has to be made. That takes time, and the time must be planned in before you cancel anything. A mould usually takes 25 to 65 days to make, depending on its complexity.
Secure the stock
The biggest risk in a change is not the quality at the new factory. It is the gap between the last delivery from the old one and the first from the new.
- Place a final order with your current supplier that lasts until the new one is running, with a margin.
- Run in parallel if you can: let the new factory produce a first, smaller order while the old one still delivers.
- Inspect the final order from the old supplier extra carefully. A supplier that knows it is losing the client has less to gain from doing its best.
The first order at the new factory
Inspect the first production before it ships, against the approved sample and the specification. This is where differences show: a material that is almost the same, a finish that is slightly different, packaging that is not quite right.
It is cheap to fix in Shenzhen and expensive once the goods are in your warehouse. Our staff carry out these inspections on site, also for clients who handle everything else themselves. See factory visits and quality control.
Close with the old supplier
Close in writing, factually, and once you have what you need: tooling, documentation and the goods you have paid for. A change that ends in a row costs more than it needs to, especially if the tooling is still in the old factory’s premises.
Timing
Avoid making the change just before Chinese New Year. Factories stand still for several weeks, and the new supplier will not get going in time. More in the guide on Chinese New Year.
How long a change takes
With finished drawings and an approved sample, a quote from a new factory usually takes a couple of days. If the tooling can be moved, the rest is transport, trial shots and approval. If a new mould has to be made it usually takes 25 to 65 days, and the first production then often around 30 days. Then comes the freight.
Plan your stock for the longest path, and be glad if it goes faster.
Common mistakes
- Changing on price alone. A lower quote from a factory nobody has checked is not a saving. It is a new risk.
- Changing the product at the same time. Change supplier or change the product, not both at once. Otherwise you will not know what caused a deviation.
- Moving tooling without checking its condition. Worn tooling gives the same problems at the new factory as at the old.
- Skipping the inspection of the first order. The new factory has not made your product before. The first order is the one that most often deviates.
- Cancelling the old supplier before tooling and documentation are secured.
When it has already gone too far
If the supplier has stopped answering, or the quality is so poor the goods cannot be sold, there is rarely time for a calm plan. Then the first step is to find out what has actually happened, and what can be saved. That is what project rescue is about. And if you need help finding and checking the new supplier, there is sourcing and supplier selection.