Process

Some arrive with finished drawings and want a quote and a lead time. Others turn up with something sketched on the back of a paper plate, no idea what it is made of, and a feeling that it probably needs a logo.

Both work. The first is faster. The second is not a problem — it is most of what we do. Below is the whole chain, and few projects use all of it.

  1. 01

    Idea and development

    Whatever you have, sketches on a napkin, a rough prototype, or just a clear idea, we take it from there. CAD, construction drawings, materials, all the technical groundwork that makes the product manufacturable.

  2. 02

    Sourcing and samples

    We find the right manufacturer, usually in China but sometimes in Europe. We do not pick the first option. We check track record, financial stability and quality, and bring in samples for evaluation. Accredited testing through institutes in China when needed.

  3. 03

    Manufacturing and control

    Production goes ahead with the chosen factory. Before anything ships, we do delivery control. No nasty surprises when the container lands.

  4. 04

    Packaging

    Consumer packaging, distributor packaging, print, labelling, EAN codes, manuals, packaging text in the right languages. Whatever the product needs to look ready for shelf.

  5. 05

    Logistics and import

    Door to door if needed. Shipping from China, customs, VAT registration, onward transport within the EU. No paperwork you need to fill in. No charges you need to calculate.

  6. 06

    Launch and sales

    Distributor recruitment and dealer networks if your product needs a wider channel. Which market to take first, which channel it belongs in, and what a dealer needs to hear to say yes. We have done this in most European markets.

  7. 07

    Restocking

    When the product sells and you need more, we handle that too. You order from us, we top up from the factory. You own the tooling you have paid for and the drawings, so if you ever want to take it over, we hand it over.

What we need
from you

To get started. If you are missing some of it, that is not a problem: sorting it out is what the first call is for.

Description
What the product should do, who it is for, and what it replaces.
Material
A drawing, a CAD file or a reference product. A sketch or a photo is enough to start.
Volume
The intended volume of the first order, even if it is an estimate.
Target price
What the product may cost per unit, or what it should sell for in a shop.
Timeline
When the goods need to be there, and what sets that date.

What people
ask first

Do I need drawings or a prototype to start?

No. A sketch, a photo or a description is enough. We turn it into drawings a factory can quote from, and tell you which details drive the cost while changing them is still free.

How is this different from a sourcing agent?

An agent passes emails between you and a factory. We have our own company in Yantian, Shenzhen, with staff, an office and a 500 m² warehouse, so someone we employ visits the factory and checks the goods before they ship. And we do not stop at the factory: drawings, packaging, freight, import and restocking are the same job, with one party responsible.

Is everything made in China?

Most of it: textile, plastic, metal, casting, milling and turning. When volume, material or budget make China the wrong answer, we make it in Europe.

Can you make private-label products for my shop?

Yes. It is one of the two things we are built for. Products that are yours, made for your customers, priced for your business and not available from the shop down the road.

How do you control quality?

Before production we check the supplier's track record, financial stability and quality, and evaluate samples. Before anything ships, our own staff do delivery control. When a product needs it, accredited testing goes through institutes in China.

Do you handle freight, customs and import?

Door to door if you want it. Sea, rail or air from China, customs clearance, VAT registration, EORI and onward transport inside the EU. No paperwork for you to fill in and no charges for you to calculate.

What does it cost?

There is no price list, because there is no template. Fixed price when the job can be clearly defined, ongoing billing when development needs room, markup or a management fee once the product is in production. We quote after a first call. That call is on us, and in it you learn what drives the cost of your particular product.

Who owns the tooling and the drawings?

You do, once you have paid for them. If you ever want to take over restocking yourself, we hand it over.

Do you sign a non-disclosure agreement?

Yes. We sign an NDA before you send drawings or other material, and we never share your material with a factory without your approval.

Is there a minimum order quantity?

Most suppliers accept orders of any size, but the price follows the volume. For smaller orders we usually work with smaller suppliers, and for very large projects with suppliers that have the capacity for them, anything from disposable cutlery to large diesel generators. It can usually be made to work.

How long is the lead time?

With a finished drawing we can usually get a quote within a couple of days, and production then often takes around 30 days. Starting from an idea, drawings, supplier selection and a quote take from a few days to a few weeks. Parts that can be made directly, by CNC for example, start at once; a mould usually takes 25–65 days depending on its complexity. Then comes the freight, and holidays in China, Chinese New Year above all.

What will you not make?

Nothing that plugs into the wall: generators and battery products are fine, 230 and 400 volt mains equipment is not. Nothing you eat or put on your skin. No fast fashion. And nothing where the regulatory responsibility lands on us while the quality sits with someone else.

Who have you worked for?

We publish clients and cases only with their permission. What we can always show is what we have built ourselves. See the About page.

How long it takes depends on the product, on what you arrive with, and on the budget. There is no useful answer in weeks until we know those. Tell us what you have and we will put a timeline together quickly.