It is the question we hear most, and it cannot be answered without knowing more. Asking what it costs to develop a product is like asking what food costs. One project needs moulds, drawings and several rounds of samples. Another is printed napkins. Both are products from China.
What can be said is what the cost is made of, and what drives each part. That is more useful than an average, because it shows where you can make a difference.
Why there is no single answer
Three things decide almost everything: how much needs developing before anything can be made, which manufacturing method the product needs, and how many you will buy.
A product that can be milled or turned straight from a drawing costs little to get started but more per unit. A product injection-moulded in plastic needs tooling that costs real money before the first part exists, but becomes cheap per unit once the volume is there. Where the break-even lies depends on the product, and that is where most calculations go wrong.
The cost items
Engineering and drawings
If you arrive with a finished drawing that a factory can quote from, this item is already paid for. If you arrive with a sketch, a photo or an idea, someone has to produce the documentation. It is also where the most expensive mistakes are made, because a detail that looks harmless on screen can double the cost of the tooling. More on product development and CAD.
Samples
Before anything is made in volume you approve a sample. Sometimes one is enough. Often two or three rounds are needed, each costing both money and time. More rounds are rarely the factory’s fault: usually the specification was unclear to begin with.
Tooling
Moulds, dies and fixtures. For products that are injection-moulded, die-cast or stamped, the tooling is often the largest single cost before the first order. It is paid once and used for every order after that. That is why it matters who owns it, which has a guide of its own: who owns the tooling and the drawings?
The first order
Unit price times volume. It is the item people think of first, and the easiest to compare between quotes. It is also the one most affected by all the others. Most suppliers accept orders of any size, but the price follows the volume.
Testing and certification
Depending on the product and the market, it may need testing against EU requirements before it can be sold. The testing is done by institutes such as SGS, Intertek or TÜV. The cost depends on which rules apply to your product, and it is easy to forget until someone asks for the paperwork. More in the guide on CE marking and the importer’s responsibilities.
Packaging, labelling and manuals
Consumer packaging, outer cartons, print, EAN codes and manuals in the languages the product is sold in. Usually a small cost per unit, but it has to be developed before production, not after.
Freight
Sea, rail or air. Weight, volume and urgency decide. As a rule sea is cheapest and slowest, air fastest and most expensive. More in the guide on sea, rail or air freight from China.
Duty and VAT
Customs duty depends on the tariff code the goods are classified under, and rates vary a great deal between goods. VAT is charged on import. How import VAT is reported depends on the member state; in Sweden, for example, a VAT-registered business usually reports it in its VAT return, as the Swedish Tax Agency explains for goods bought from outside the EU. Swedish Customs has a guide to starting to import.
Why unit price and tooling are tied together
Tooling is a fixed cost spread over every unit produced. At low volume that share of the unit price is large; at high volume it almost disappears.
That is why two quotes for the same product can look completely different. One factory proposes simple tooling and a higher unit price. Another proposes more expensive tooling that brings the unit price down. Which is cheaper depends entirely on how many you will sell, over how long. Always ask: at what volume do the two options break even?
The same logic applies to the choice of method. Parts that can be made directly by CNC need no tooling and start at once, but cost more per unit. As volume grows, a mould often becomes cheaper overall, but it takes time to make. The right answer changes with volume, so the question needs asking again once sales pick up.
What makes it more expensive than it needs to be
Most of the extra cost we see is not the factory’s doing. China can deliver quality as good as anyone. It comes down to how you buy and how you specify the product.
- Tolerances nobody needs. Tight tolerances cost in machining, in inspection and in rejects. Set them where the function demands it, not everywhere.
- Changes after the tooling is made. A change on the drawing costs almost nothing. The same change in finished tooling can cost as much as starting over.
- An unclear specification. If the material, finish or colour is not specified, the factory chooses. Often the cheapest. Then comes another sample round.
- Packaging at the last minute. A carton designed when the goods are already finished delays shipping, and whoever is in a hurry pays for it.
- Comparing unit prices instead of total cost. The cheapest quote per unit is not the cheapest deal once tooling, samples, freight and quality are counted.
How to get a price that holds
A price holds when the documentation does. Before you ask for a quote, make sure you have:
- A drawing or description of what the product must do, in which material and with which finish.
- An estimated volume, for the first order and per year.
- A target price, so the supplier can suggest where to save.
- Labelling, certification and packaging requirements for the markets you sell in.
With a finished drawing we can usually get a quote within a couple of days. Without one, the work starts with producing it.
If you want to know what drives the cost of your particular product before committing money, there is the feasibility study: a written document on manufacturing method, cost drivers, lead time and risks. And if you want to know how long it takes, there is the guide how long from drawing to delivery?